Sunday, August 31, 2008
First Blog
Foundation progress
Here is the blueprint, again showing the size differences. This blueprint is drawn to scale.
They poured the first part of the foundation last week. They hooked the cement truck up to this big "pumper" which reached across the entire width of the foundation so they never had to move the cement truck.
This shows the long arm of the pumper as they pour the north foundation. The men are Phil Christopherson, who works for Idea Inc., who will actually own the building, and Monte Ellison, the owner of MidValley Construction company who is the general contractor.
The first part of the foundation all poured, with the forms removed. They then wired some more rebar supports and brought in the supports for the next part of the foundation.
It will take them nearly two weeks to get these supports ready to pour the next phase of the foundation which is scheduled to pour on Sept. 11. Quinton wanted to "pose" for the photo, showing the size of the foundation. Note that he is standing on the foundation base.
There is still a water issue on the north west corner. They don't think it will be a problem though. Quinton threw a rock in the water to have an "action shot". Sunday, August 17, 2008
Framing the foundation and solving water issues.
This shows the water work that they did to eliminate the water hole that we had on the north east corner of our lot. They knew they would have to design a way to fix that before we began as the hole would have interfered with the parking area. There were three water pipes emptying into this pit before they put in these manholes.
They inserted rebar in each of the sections of the foundation where the posts to support the big steel building will be. This shot shows that we still have a water problem. After rerouting a few water pipes, they were hoping that this water would all dry up. There were irrigation pipes, sump pumps and who knows what else draining in this area. This is the northwest corner of the building. They have a few options if the rerouting didn't work -of course for more $.
Notice the size of the foundation compared to our old preschool. The new building is going to make our present preschool look like the playhouse.
Sunday, August 10, 2008
Quinton in Wyoming All-State Marching Band
Water Fun Friday!!!
Although the kids had the time of their lives, the new sod took quite a beating. There was still standing water on Saturday.
Digging the Foundation
Saturday, July 26, 2008
Smart-Start Quality Childcare Groundbreaking
Here are some of the children decked out in their hard hats and shovels ready for the ground breaking. Notice the nice soft sand for the kids to dig into. The real dirt under was so hard that we didn't think the kids could dig it. The problem was, after the first shovel full, the kids wanted to keep digging and playing in the sand. We had to take the shovels to our own sandbox inside the fence for them to play with the rest of the day.
Let the dirt fly!
"You can stop any time now" The general contractor was about to hire some of these hard workers because they wouldn't stop digging.
The construction company ordered balloons and doughnuts to add to the celebration. It was a fun day for all.